Rant: foreman at the Ocala job said my layout looked like I did it with my eyes closed
He wasn't being funny either, he walked the whole slab and pointed out I was pulling tape from the wrong corner every single time. Now I snap my control line off the longest wall first and chalk the numbers right on the deck, and honestly the framing has been dead on since. Anyone else get called out on something basic and have it stick with them for years?