Am I the only one who thinks 10,000 bd ft of wasted plywood taught me more than any class?
Just hit my 10,000th board foot of plywood cut in my garage setup and realized half of it was thrown out from bad measuring. I stopped trusting the factory edge on sheet goods and started squaring every piece off my table saw sled, and my cabinet boxes finally sit flat. Anyone else cut their teeth on cheap material before moving to real stock?