Three failed panel swaps in one day, all rookie mistakes
Monday was brutal. First job missed a resistor on the keypad zone, second one I forgot the transformer polarity, third I mounted the panel upside down because I was rushing. Had to redo all three by 2 PM. Anyone else have a day where your own shortcuts cost you more time than doing it right the first time?